Common Problem


 Common Problem

中国石化广州分公司制水供水项目


    中国石化广州分公司制水供水项目

Project Name: China Petrochemical Guangzhou Branch water supply project

Project Time: July 2010

The use of technology: high-density clarifier pool, flap filter

Technical advantages: The effluent quality reaches below 0.3NTU, the processing capacity is increased by more than 30%, the filter operation period is 36-72 hours, the backwashing water consumption is reduced to below 1.5% of daily output, fully automatic operation and low investment cost.